Archive

Highwood Public Library is undergoing a large renovation project to support and improve their literacy-focused services and resources. The library serves an important function in the Highwood community and the planned addition and renovation of the Front Entry, Community Room, Children’s Department, Young Adult Department...

845 designed a new 12,000sf satellite fire station in Wheeling, Illinois for the Wheeling Fire Department. The station has 3 apparatus bays and is designed with efficiency for more rapid response times. This facility serves as a template for future satellite stations in the Village....

845 Design Group was proud to serve as the architectural consultant for the design-build team with RJN Group and Boller Construction Company for the West Park Wet Weather Storage Facility in Wilmette. The project consisted of a 5.5 million gallon underground storage tank located below...

845 Design Group was proud to serve as the architectural consultant for the design-build team with RJN Group for the renovation of the existing lift station. The City of Elmhurst underwent extension stormwater management measures which required a new generator and expansion of the existing...

The existing Board Room required cost effective updating. Removing existing outdated residential paneling, painting the space, recarpeting, and providing a new logo better representing the Village, updated the space on a tight budget....

The existing Board Room had not been updated for fifty years. The in the round seating and existing stepped pews created a complicated renovation. The seating selected mimics that of a plane jump seat to accommodate the existing stepped seating configuration....

845 Design Group is the architect of record, leading a multidisciplinary team in the design of a 5,000sf free-standing U.S. Customs and Border Patrol facility at Chicago Executive Airport in Wheeling, Illinois. The municipal airport is co-owned by the Village of Wheeling and the City...

845 Design Group assisted the Village of Wheeling in a feasibility study for an addition to their existing Village Hall to house a Community Room that would be open to various community groups such as the Senior Congregate Dining Program, Economic Development Breakfasts and Citizen...